Open full view…
Input export constraint at 750 kW. However, in output export limit is 375 kW.
cwilliams979
Tue, 07 Jun 2022 07:06:35 GMT
I am using the DER-VET software to size and simulate a solar battery energy storage site, with a 750 kW export constraint.
However, setting the export constraint to 750 kW leads to only a max discharge of the BESS and solar to the grid of 375 kW in the time series results.
Does anyone have any thoughts as why this is the case?
I have tried changing multiple parameters with no success.